What does manual work cost your company?
Every company carries a cost that appears in no budget line: the hours your team spends moving data between systems by hand, rebuilding the same Excel report every month, and chasing down where an approval got stuck. Put in your own numbers and see it in one figure.
Your numbers
The defaults describe a typical 60-person distribution or manufacturing company in Georgia. Replace them with your own — the result updates as you type.
Cost of manual work
—
per year — a cost that appears in no budget line
Full breakdown
Every step of the arithmetic, so you can check it or argue with it.
Labour
Errors
Total and payback
See the full breakdown
The total above is yours to keep. Leave your email below and the line-by-line breakdown unlocks, including savings and payback.
Unlock the breakdown
Not sure the number is right?
Send us one process in three sentences — what happens, who does it, how often — and we will tell you honestly whether it is worth automating. Sometimes the answer is no, and that is a useful answer too.
Assumptions and sources
- Defaults describe a modelled 60-person Georgian distribution or manufacturing company. They are a starting point, not a measurement of your business.
- Hourly cost = gross monthly salary × 12 × (1 + employer overhead) ÷ productive hours per year.
- The 2% manual entry error rate sits in the lower half of the 1–4% range reported in industry studies. If you have measured your own, use it.
- The late-decision figure is the one number nobody can calculate precisely. Keep it conservative, or set it to zero — the total stays significant either way.
- The 30–60% reduction range reflects automating one well-chosen process. It is not a guarantee and does not apply to every process.
- This is an argument for starting a conversation, not a business case. Any project should pay for itself out of exactly this cost — if you cannot see how, do not start it.